News

Outdoor load center installation problems

1. After the distribution board enters the distribution state,it is not allowed to arbitrarily pull up the speed switch of the power screen,and the latching switch of the air circuit breaker is not allowed to be used in case of emergency.

2. The parallel operation of generators shall be carried out in strict accordance with the requirements and provisions of merging conditions,and attention shall be paid to the phenomenon of reverse power and merging failure.

3. When the machine is stopped,the generator load shall be cut off first,and then the machine shall be stopped without load,and the machine shall not be stopped directly with load.

4. When the shore power is intersected,all power switches on the shore power screen shall be cut off first,and then the correctness of wiring and phase sequence shall be checked. Only after the correctness is confirmed can the conversion of shore power be implemented.

5. The outdoor load center shall be cleaned and maintained regularly so as to keep the equipment in a good working condition.

FAQ:

 

1. Installation method of stainless steel load center:

The installation position of load center should avoid direct sunlight, splash water and moisture.Clean the equipment regularly,check the wiring terminals and switches, whether the contactor is good, whether the internal overheating phenomenon,check the sealing performance regularly.Should check whether the installation position is firm, do not tilt shaking.

2. Low voltage load center for what industries?

Can be used as branch distribution or load power supply control cabinet,the internal switch using plastic case circuit breaker,small volume,high segmentation capacity, compact structure,good technical performance.And installation is simple,safe and reliable use.Widely used in industrial and mining enterprises and civil buildings, high rise buildings, hospitals,squares,cultural and sports facilities,residential and other modern building power distribution equipment.

3. How to solve the problem of load center rust?

If the load center body is not made strictly,when the sun shines directly,due to the greenhouse effect, the box body temperature is lower than the external temperature, then the neutral load center body will absorb the external temperature.This creates moisture and corrosion.However,it is generally more difficult to prevent corrosion materials from peeling off.


Post time: Oct-23-2019